Project Description
UCHealth Anschutz Cancer Center Pavilion
Project Description
This project involves the installation of a new Varian Edge Linear Accelerator equipment into the existing linear accelerator vault #3 currently being used as a storage and work area.
A second LINAC was added in vault #4 for the Anschutz Cancer Pavilion on the Fitzsimons Campus.